Facebook Pixel
Background logo
lego block logo

SociiLabs

The agency you don't have to hire twice.

Production-grade MVPs and SaaS platforms, shipped in 4–8 weeks by engineers who stay through scaling.

15+ years of engineering. 14+ products shipped — 6 in the last 8 months. One founding team that actually shows up on Slack.

Get a Free Build Plan (5 Days)
in their words
Clutch
SociiLabs built what you actually need... without ever making me feel like an idiot for handing them a disaster in the first place.
BK
Ben Karpinski
Owner · Supersonic Media Solutions · Replit → Production rebuild
View on Clutch →
Service IconHow We Build Differently

We're not an agency with an "AI offering."
We're an AI-native engineering team.

AI in the actual coding loop

Our engineers use AI assistants throughout development — not to replace thinking, but to delete the mechanical parts: boilerplate, test scaffolding, context switching. The time saved goes into architecture and review, not into the invoice.

More time on architecture & review

Zero-cost scaffolding for clients

We have battle-tested boilerplates for auth, RBAC, multi-tenant SaaS, and subscription billing. You don't pay to rebuild infrastructure that already exists. We skip to your actual product.

Ship in 4–8 weeks, not 6 months

LLM observability & DevOps most agencies skip

Langfuse for LLM tracing. GCP + Cloud Run + Docker for deployments. Infrastructure automation from day one. At our price point, agencies normally don't run this stack — we do by default.

Production-grade from day one

The same budget goes further

When the scaffolding is already built and the delivery team is senior, more of your budget buys product instead of setup. That's why our $5–20K SaaS tiers ship what other shops quote six figures for.

Transparent scope estimates

Core Stack

React
Next.js
Node.js
Express
PHP
Laravel
Python
FastAPI
GCP
Docker
AWS

AI & Observability Layer

Claude API
Claude Code
Cursor
Windsurf
Warp
Langfuse
n8n
OpenRouter
Pencil

Your SaaS MVP ships in 4–8 weeks.

Not 6 months. And it doesn't fall apart when it scales.

See what it costs
Service IconOur Approach

Built Around You —
Structured for Speed

Discovery before code. Working software every week — not status updates, not Figma revisions. If scope changes, you hear it that sprint with a recommendation, not in a change order three weeks later.

Step 1

Scope & Align

We spend Week 1 getting this right so you don't pay for the wrong thing.

Step 2

Build Fast, Show Early

You see working software in Week 2. Not a deck. Not a Figma file.

Step 3

Ship on Your Stack

Your cloud. Your repo. Your code. You own everything from Day 1.

Step 4

AI, Designed In

We don't bolt AI on after the fact. It goes in at the architecture level.

Step 5

Launch & Stay

We don't disappear after go-live. We're still on Slack when it matters.

Team IconMeet Our Team

Your Technical
Partners - From First
Line to Launch Day

You'll work with the founders, not an account manager. Arslan spent 15+ years in engineering leadership — Senior Technical Lead at Nisum, where he led GenAI delivery. Anas is COO — IBA, AI/ML at Nisum. Kashif is CTO, bringing 23+ years of software development experience across complex platforms and production systems. You work with the team that ships — they're in your Slack.

Arslan Aslam

Arslan Aslam

CEO & Co-Founder

Anas Shahid

Anas Shahid

COO & Co-Founder

Kashif Chishti

Kashif Chishti

CTO

Service IconFAQs

Your Questions,
Answered

What does a build cost?

Validate builds start from $5k. SaaS MVPs usually range between $5k–$12k — but the actual cost depends on the scope and feature-set of the requirements. We scope and price projects individually and usually get back to a quotation request within 24 hours. Fill out the contact request with your scope details or .

Who owns the IP and the code?

You do. Full code ownership from commit one — your repo, your cloud, your IP. We don't hold code hostage, and we don't license you back your own product.

What if we're not the right fit?

We'll tell you. On the scoping call we'll say so if your timeline, budget, or problem isn't something we can own well. No hard sell — you'd rather hear that in 30 minutes than three weeks into a bad engagement.

How long until we ship?

Validation builds ship in 3–4 weeks. A production-grade SaaS MVP typically ships in 4–8 weeks. Larger platforms and rescues take longer — we scope the timeline before kickoff so you know what you're buying.

Talk to an engineer

30 minutes. You'll leave with a rough scope and a real timeline — whether or not you work with us.

Get an instant estimate →
No commitment required
You leave with a scope and timeline
If we're not the right fit, we'll tell you